Case Studies
ECML Rock Cuttings
Retaining Walls
- Site:
- ECML Rock Cuttings
- Date:
- August 2009 to February 2010
- Value:
- £510k
- Client:
- Network Rail
- QTS Status:
- Principal contractor
Details:
Design and build. East Coast Main Line, Works to stabilise cuttings. Rock and soil stabilisation works, building of retaining walls and drainage works.