Case Studies

Grange Park

Embankment Regrade

grange park
Contract:
Grange Park
Client:
BAM Nuttall
Designer:
Donaldson Associates
Contract Value:
£1.1M
Contract Form:
NR 8
Contract Duration:
16 weeks

Project Description / Scope of Works

Regrade of a section of railway embankment on the HDB line between 08m0316yds and 08m0613yds (North London).

The works involved the installation of 61,000t of compacted granular fill, 550m cess walkway and associated drainage works.

QTS worked in close liaison with BAM Nuttall and their designer to ensure that the most cost and programme effective solution was pursued to construction (including use of recycled materials from local source).

All works were completed within programme & budget, and without any accident or incident.

Key Issues

  • Develop construction methodology to maximise outputs.
  • Works within residential area in North London.
  • Limited materials availability.