Earthworks and Geotechnical services include:
Mulben slope on the Aberdeen to Inverness line near Keith is a 45m high soil slope which has caused Network Rail problems for...
At Bishopton East, both Up and Down sides of the cutting were exhibiting historical problems which had the potential for furt...
A soil cutting at Inveresk had been subjected to extensive rabbit infestation for a number of years, resulting in multiple sm...
QTS have been delivering solutions to Network Rail in Scotland since 2005. At Bishopton, the use of disruptive access and de...
A total of 32 slopes spread over 9 sites and 12 miles make up this extensive project. Delivered over 35 weeks, this project...
A regrade of the existing cutting was required, however the adjacent depot used the siding so coordination around train movem...
Following various attempts by other contractors to fix a serious problem with drainage at this slope, QTS were instructed to...
The north portal of Drumlanrig Tunnel on the GSW was overgrown with trees and required works to the rock cutting approach, as...
This site, situated close to the border on the East Coast Mainline, required rock netting and catch-fences to make the site s...
Managing 8 different sites on the Oban line spread over 12 miles was a test in logistics. Time on site during this design &a...