REL was originally engaged by the ATC JV to complete all works associated with the installation of the OLE infrastructure within the Plumstead sidings depot. This included the main steel installation, SPS and associated cantilevers, long track wiring, along with the associated switches, section insulators and supplementary bonding. REL completed these works safely and ahead of programme. From this, we were engaged to complete further work within the mainline tunnels that had originally been allocated to another contractor. REL installed in excess of 40km of ridged beam catenary equipment, inclusive of supporting brackets, tunnel drilling and wire installation.