Stirling-Alloa-Dunblane

Electrification Case Study

REL were engaged by Costain, under the banner of ABC, to deliver all the works associated with OLE installation route-wide between Alloa to Stirling via Dunblane.

The project was tasked with the electrification of 98 single track kilometres of diesel only infrastructure. REL installed all the main steel and associated SPS, including the installation and registration of all cantilevers and rigid beam tunnel equipment inclusive of associated tunnel and bridge drilling.