Ayr Line 1

Vegetation Management Case Study

This project was part of Network Rails High Priority works commissioned by the works delivery unit. The track chipper was accessed by taking line blocks to allow the vast majority of the work to be carried out in daylight, which reduced disturbance to line side neighbours and improves production. The before and after images show the dramatic difference from start to finish.

Ayr Line 1 - Image 1 Ayr Line 1 - Image 2
  • network-rail-pos.png
  • network-rail-pcl.png
  • constructionline.png
  • chas.png
  • safecontractor.png
  • uvdb.png
  • Irata.png
  • risqs.png
  • iiyp-plat-logo.png
  • 0054_ec_ukas_14001_hr_b.jpg
  • 0054_ec_ukas_45001_hr_b.jpg
  • 0054_ec_ukas_9001_hr_b.jpg