ECA2 Line

Vegetation Management Case Study

The ECA2 Line required the de-vegetation of an extremely heavily crowded embankment. The project took our team 2 weeks to complete and the end result shows just how drastic the vegetation clearance works were. The client was extremely impressed with the end result.  

ECA2 Line - Image 1 ECA2 Line - Image 2
  • network-rail-pos.png
  • network-rail-pcl.png
  • constructionline.png
  • chas.png
  • safecontractor.png
  • uvdb.png
  • ec-iso-9001.png
  • ec-iso-14001.png
  • ec-iso-18001.png
  • irata.png
  • risqs.png
  • investors-in-young-people.png